• print view
      • Link to this page

      Technik

      Construction of the pilot scheme

      Bau der Pilotanlage

      Wir haben den Entstehungsprozess der Pilotanlage LURITEC dokumentiert. Hier sehen Sie die wichtigsten Stationen der Bauarbeiten: den Stahlbau, die Anbringung des Korrosionsschutzes, die Gründung der Anlage in der Spree, …

      Construction of the pilot scheme

      We have documented the development process of the pilot project „LURITEC“. Here you can see the main stages of construction: …

      LURITEC, the video

      LURITEC - the new technology for residential water management

      New perspectives for urban planning: Water as a resource, as an economic and image-factor for cities – there is scarcely any other topic that occipies people more at the beginning of the 21th century. Rivers and lakes are often heavily polluted in towns and cities. The reason for this is introduction of wastewater from the mixed sewers. If the cappacity of the sewer-system is exhausted in case of heavy rain-fall, the mixed water consisting of rain and household waste-water …

      Preisträger:
      Werkstatt N | Nachhaltigkeit – Vom Impuls zum Projekt
      Sponsored by:
      Bundesministerium für Bildung und Forschung Stiftung Zukunft Berlin Berliner Wasserbetriebe
      With kind support:
      Kompetenzzentrum Wasser Berlin KSB - Pumpen, Arnaturen, Systeme